After the old fallen wall was pulverized and the steel bars scavenged for reuse, after the ditch was dug (days 1 and 2) and the deformed steel bars skeleton of the posts were assembled (day 3), it was time to set the posts' foundation in cement (day 4).
just add water : sand, gravel and cement
setting a firm post foundation
No comments:
Post a Comment